Notice of Required Connection Polygon A Miami-Dade County
About This Dataset
This dataset has not yet been AI-described.
Key Metadata
| Publisher | Miami-Dade County |
|---|---|
| Department | N/A |
| Category | Production Content |
| Format | Feature Service |
| Last Updated | Updated 6 days ago |
| Rows | None |
| Civic Relevance | N/A |
| Update Frequency | None |
| Source | View on Open Data Portal |
Columns / Fields
| Name | Type | Description |
|---|---|---|
OBJECTID |
integer | NoticeOfReqConnection_poly: OBJECTID |
FOLIO |
text | The property's folio number, which is Miami-Dade's unique identifier for individual parcels of real estate used in tax and property records. AI |
NORCID |
text | The Notice of Required Connection ID—a unique reference number for this specific notice issued to the property owner. AI |
CONNECTION |
text | A code or description indicating what type of utility connection is required (such as sewer, water, or both). AI |
APPNAME |
text | The name of the applicant or property owner who submitted the notice of required connection application. AI |
APPSTATUS |
text | The current status of the application, indicating where the required connection request stands in the approval or implementation process. AI |
STATUSDATE |
date | The most recent date when the application or connection status was updated. AI |
ALLOC_ID |
text | A unique identifier code assigned to this property or allocation within Miami-Dade's system for tracking required sewer and water connection notices. AI |
PSOWNER |
text | The name of the entity or person responsible for operating and maintaining the pump station serving this property. AI |
PSNUMBER |
text | The pump station number or similar utility infrastructure identifier associated with this property's connection. AI |
CONTAMWELL |
text | A code indicating whether the property has a contaminated well; this helps determine if water connection is necessary. AI |
WATERDATE |
date | The date when the water connection requirement was issued or when the connection was completed. AI |
SEWERDATE |
date | The date when the sewer connection requirement was issued or when the connection was completed. AI |
GlobalID |
text | NoticeOfReqConnection_poly: GlobalID |
Shape__Area |
number | NoticeOfReqConnection_poly: Shape__Area |
Shape__Length |
number | NoticeOfReqConnection_poly: Shape__Length |
Related Datasets
Quality Breakdown
A
Composite Score: 96%
Findings
- Row count not available