Potential Collaboration Project D Miami-Dade County
About This Dataset
This dataset identifies construction and infrastructure projects across Miami-Dade County that might overlap in location or timing, helping different government agencies coordinate and avoid conflicts. It tracks which agencies are involved, what type of utilities or facilities they're working on, and when these projects are scheduled, making it easier for departments to plan work together and prevent costly delays or safety issues.
Why This Matters
- A construction contractor bidding on a county project checks this data to see if other utilities (water, power, telecom) are being dug up at the same location during their planned timeline.
- A city planner reviewing a neighborhood's infrastructure schedule uses this to identify which agencies are working nearby and coordinate temporary traffic detours or road closures.
- A resident notices road work starting on their street and looks up what projects are happening to understand why their water or power might be affected during construction.
Key Metadata
| Publisher | Miami-Dade County, Florida |
|---|---|
| Department | Information Technology Department |
| Category | Communications and Information Technology Department |
| Format | Feature Service |
| Last Updated | Updated 8 days ago |
| Rows | None |
| Civic Relevance | MEDIUM |
| Update Frequency | Daily |
| Source | View on Open Data Portal |
| Keywords | construction projects infrastructure coordination utility conflicts project scheduling agency collaboration roadwork utility work project timeline Miami-Dade projects construction conflicts |
Columns / Fields
| Name | Type | Description |
|---|---|---|
OBJECTID |
integer | PotentialConflictProject: OBJECTID |
FACTYPE1 |
text | The type of utility or facility associated with the first project, such as water, electrical, or transportation infrastructure. AI |
AGCYNAME1 |
text | The name of the first government or public agency involved in the potential collaboration project. AI |
FACTYPE2 |
text | The type of utility or facility associated with the second project, such as water, electrical, or transportation infrastructure. AI |
AGCYNAME2 |
text | The name of the second government or public agency involved in the potential collaboration project. AI |
STARTDATE |
date | The date when the potential collaboration project is scheduled to begin. AI |
ENDDATE |
date | The date when the potential collaboration project is scheduled to end or conclude. AI |
MODIDATE |
date | The date when this record was last updated or modified in the system. AI |
CONFLTID1 |
text | A unique identifier code for the first project that may have potential conflicts or overlaps with other initiatives. AI |
CONFLTID2 |
text | A unique identifier code for the second project that may have potential conflicts or overlaps with other initiatives. AI |
UNIQUEID |
text | A unique identifier number that distinguishes this specific potential collaboration project from all others in the database. AI |
GlobalID |
text | PotentialConflictProject: GlobalID |
Shape__Area |
number | PotentialConflictProject: Shape__Area |
Shape__Length |
number | PotentialConflictProject: Shape__Length |
Related Datasets
Quality Breakdown
D
Composite Score: 51%
Findings
- Very stale: 8 days since update (expected every 2 days)
- Row count not available